OPENING CEREMONY (30.06.2018)
FINISHING WORKS (01.02.2018)
FINISHING WORKS (28.12.2017)
FINISHING WORKS (28.11.2017)
FINAL WORKS FOR DOORS & WINDOWS (31.10.2017)
INTERNAL TILING WORKS (15.10.2017)
INTERNAL TILING WORKS (02.10.2017)
INTERNAL TILING WORKS (14.09.2017)
INTERNAL TILING WORKS (01.09.2017)
BATHROOM TILING WORKS (15.08.2017)
DOOR FIXING & BATHROOM TILING WORKS (30.07.2017)
4TH FLOOR BED LEVELING WORKS & WINDOW FRAME PREPARING WORKS (15.07.2017)
6TH FLOOR DOOR FRAME FIXING WORKS (01.07.2017)
APPLYING SKIN CODE AND DOOR FRAME WORKS (16.06.2017)
1ST CODE WALL PAINTING WORKS (01.06.2017)
COMPLETING THE STRUCTURAL WORKS (15.05.2017)
ROOF TOP RETAINING WALL BUILDING & 8th FLOOR UNIT PARTITION WORKS (30.04.2017)
8th FLOOR UNIT PARTITION WORKS (15.04.2017)
REINFORCEMENT WORKS FOR SWIMMING POOL COLUMN (01.04.2017)
CONCRETE WORKS FOR ROOF TOP (15.03.2017)
SHUTTERING WORKS FOR ROOF TOP & 6th FLOOR UNIT PARTITION (01.03.2017)
REINFORCEMENT WORKS FOR 10th FLOOR COLUMN & 3rd FLOOR UNIT PARTITION (15.02.2017)
FORM WORKS FOR 9TH FLOOR SLAB (31.01.2017)
REINFORCEMENT WORKS FOR 8TH FLOOR SLAB (16.01.2017)
COLUMN SHUTTERING WORKS FOR 8Th FLOOR SLAB (01.01.2017)
7TH FLOOR SLAB FORM WORKS (16.12.2016)
REINFORCEMENTS WORKS FOR 6TH FLOOR SLAB & UNIT PARTITION WORKS (30.11.2016)
COLUMN WORKS FOR 6TH FLOOR SLAB (17.11.2016)
FORM WORKS FOR 5TH FLOOR SLAB (31.10.2016)
CONCRETE WORKS FOR 4th FLOOR SLAB (19.10.2016)
CONCRETE WORKS FOR 3rd FLOOR SLAB (30.09.2016)
PROVISION FOR FORM WORKS FOR 3rd FLOOR (15.09.2016)
REINFORCEMENT WORKS FOR 2nd FLOOR SLAB – Final Stage (31.08.2016)
REINFORCEMENT WORKS FOR 2nd FLOOR SLAB (16.08.2016)
COLUMN CONCRETE WORKS FOR 2nd FLOOR (30.07.2016)
CONCRETE WORKS FOR 1st FLOOR (16.07.2016)
SHUTTERING WORKS FOR 1st FLOOR (30.06.2016)
CONCRETE WORKS FOR LIFT (15.06.2016)
GROUND FLOOR COLUMNS CONCRETE WORKS (31.05.2016)
GROUND FLOOR COLUMNS WORKS (15.05.2016)
PROVISION SCREED CONCRETE (30.04.2016)
COMPLETION OF UNDERGROUND SUMP (18.04.2016)
EXCAVATION WORKS (17.03.2016)
SHORING WORKS & EXCAVATION WORKS FOR SUMP (02.03.2016)
PILE CAP REINFORCEMENT WORKS (16.02.2016)
PILE CAP DEMOLISHING WORKS (30.01.2016)
FINAL STAGE OF PILING (16.01.2016)
PILING WORKS (30.09.2015)
STONE LAYING CEREMONY (21.08.2015)
BHOOMI POOJAI (20.08.2015)
SOIL TESTING (29.08.2015)
DEMOLISHING WORKS (13.07.2015)
PUNNIYASTHANA POOJAI (06.06.2015)