OPENING CEREMONY (27.01.2024)
SHANTHI POOJA (26.01.2024)
ELEVATOR(LIFT) INSTALLATION WORKS & STAIRCASE HAND RAILING FIXING WORKS (21.11.2023)
DOORS & PANTRY CUPBOARD WORKS – (02.11.2023)
FIXING OF ALUMINIUM DOORS & WINDOWS – (17.10.2023)
ROOF TOP & COMMON AREA TILING WORKS (04-10-2023)
6th & 7th FLOOR PAINTING WORKS & COMMON AREA STAIR CASE TILING WORKS (06.09.2023)
7th FLOOR – UNIT FLOOR & BATHROOM TILING WORK (17.08.2023)
LAYING THE MEMBRANE SHEET ON ROOF TOP (WATERPROOFING – (31.07.2023)
7th FLOOR – BALCONY & BATHROOM TILING WORK AND EXTERNAL PLUMBING WORK (18.07.2023)
INSTALLATION OF ALUMINIUM DOOR & WINDOW FRAMES ON 6th, 7th & 8th FLOORS (30.06.2023)
8th FLOOR – BATHROOM TILING WORK & BED LEVELLING WORK (15.06.2023)
6th FLOOR – FLOOR CHIPPING WORK – PRE BED LEVELLING (01.06.2023)
6th FLOOR – ELECTRICAL WIRING WORK – (10.05.2023)
7th FLOOR – DOOR FRAME INSTALLATION WORK (27.04.2023)
6th FLOOR – PAINTING WORK – APPLYING THE SKIM COAT (06.04.2023)
3rd FLOOR – PAINTING WORK – APPLYING THE SKIM COAT (20.02.2023)
4th FLOOR – DOOR FRAME INSTALLATION WORK & BATHROOM WATERPROOFING WORKS (31.01.2023)
4th FLOOR – UNIT PLASTERING WORK (09.01.2023)
ROOFTOP – SLAB CONCRETE WORK (COMPLETED THE ENTIRE STRUCTURAL WORKS) (24.11.2022)
ROOFTOP – COLUMN CONCRETE WORK (31.10.2022)
8th FLOOR – SLAB CONCRETE WORK (17.10.2022)
8th FLOOR – COLUMN CONCRETE WORK (29.09.2022)
7th FLOOR – SLAB CONCRETE WORK (20.09.2022)
7th FLOOR – COLUMN CONCRETE WORK (30.08.2022)
6th FLOOR – SLAB CONCRETE WORK (22.08.2022)
1st – 2nd FLOOR – UNIT PARTITION WORKS (19.08.2022)
6th FLOOR – COLUMN CONCRETE WORKS (06.08.2022)
5th FLOOR – SLAB CONCRETE WORK (26.07.2022)
5th FLOOR – COLUMN CONCRETE WORKS (07.07.2022)
4th FLOOR – SLAB CONCRETE WORK (24.06.2022)
4th FLOOR – COLUMN CONCRETE & FORM WORK (08.06.2022)
3rd FLOOR – SLAB CONCRETE WORKS (23.05.2022)
2nd FLOOR – SLAB CONCRETE WORKS (09.04.2022)
2nd FLOOR – COLUMN CONCRETE WORKS (19.03.2022)
1st FLOOR – SLAB POST CONCRETE (11.03.2022)
1st FLOOR – SLAB CONCRETE WORK (10.03.2022)
1st FLOOR FORM WORK & FRONT SIDE COLUMN CONCRETE WORK (02.02.2022)
1st FLOOR COLUMN CONCRETE WORK (12.01.2022)
GROUND FLOOR CONCRETE WORK (30.12.2021)
GROUND FLOOR SLAB REINFORCEMENT WORKS (23.12.2021)
BASEMENT RAMP & RETAINING WALL CONCRETE WORKS (14.11.2021)
BASEMENT RETAINING WALL CONCRETE WORKS & GROUND FLOOR COLUMN SHUTTERING WORKS (12.10.2021)
BASEMENT CONCRETE WORKS (18.09.2021)
BASEMENT REINFORCEMENT WORKS & FRONT SIDE SCREED CONCRETE (30.08.2021)
BASEMENT REINFORCEMENT WORKS (13.08.2021)
BASEMENT SCREED CONCRETE WORKS (02.08.2021)
GROUND EXCAVATION WORKS (02.07.2021)
PILE SHORING – GROUTING WORKS (08.06.2021)
COMMENCEMENT OF SHORING WORKS (07.05.2021)
FOUNDATION STONE LAYING CEREMONY (23.04.2021)
BHOOMI POOJA (22.04.2021)
PROJECT LAND – AFTER DEMOLISHING & CLEANING WORK (10.03.2021)
SOIL TESTING (15.02.2021)