OPENING CEREMONY (30.07.2021)

FINISHING WORKS (05.06.2021)

LAYING THE MEMBRANE SHEET ON ROOF TOP (WATERPROOFING) & FIXING OF WATER METERS (24.03.2021)

FINISHING WORKS (24.03.2021)

FIXING OF ALUMINIUM WINDOW FRAMES & DOOR FRAMES (11.02.2021)

5TH FLOOR BED LEVELLING WORKS (17.12.2020)

BATHROOM TILING WORK, FIXING OF FANLIGHT WINDOW & BALCONY WATERPROOFING WORKS (30.11.2020)

BATHROOM TILING WORK (28.10.2020)

INTERNAL WALL PUTTY WORKS & FLOOR CHIPPING WORK (30.09.2020)

SWIMMING POOL CONCRETE WORK (29.08.2020)

SWIMMING POOL BEAM REINFORCEMENT WORK (15.08.2020)

ROOFTOP RETAINING WALL CONCRETE & FIXING OF DOOR FRAME (30.07.2020)

ROOF TOP RETAINING WALL SHUTTERING & MACHINE ROOM CONCRETE WORKS (14.07.2020)

ROOF TOP RETAINING WALL REINFORCEMENT & SWIMMING POOL COLUMN CONCRETE WORKS (07.07.2020)

03rd FLOOR BATHROOM PLUMBING WORKS & 04th FLOOR ELECTRICAL WORKS (23.06.2020)

ROOF TOP SLAB CONCRETE WORK – ENTIRE STRUCTURAL WORK IS COMPLETED (13.06.2020)

ROOF TOP SLAB REINFORCEMENT WORK & 7TH FLOOR UNIT PARTITION WORK (01.06.2020)

APPLYING SKIM COAT TO 3rd FLOOR UNIT WALLS & COMMON AREA (15.05.2020)

9th FLOOR SLAB CONCRETE WORK (01.03.2020)

APPLYING SKIM COAT TO 1st FLOOR UNIT WALLS & WIRING WORKS (15.02.2020)

2nd FLOOR UNITS PLASTERING WORKS (30.01.2020)

7th FLOOR SLAB CONCRETE WORK & 3rd FLOOR UNIT PARTITION WORKS (15.01.2020)

7th FLOOR COLUMN CONCRETE WORK (30.12.2019)

1ST FLOOR UNIT PARTITION WORK (15.12.2019)

5th FLOOR SLAB REINFORCEMENT WORK & 1st FLOOR UNIT PARTITION WORK (30.11.2019)

4th FLOOR SLAB CONCRETE WORK (24.11.2019)

3rd FLOOR SLAB CONCRETE WORK (15.10.2019)

3rd FLOOR COLUMN CONCRETE WORK (30.09.2019)

2nd FLOOR SLAB REINFORCEMENT WORK (01.09.2019)

2nd FLOOR BEAM REINFORCEMENT WORK (15.08.2019)

2nd FLOOR COLUMN SHUTTERING WORKS (31.07.2019)

1st FLOOR SLAB CONCRETE WORKS (24.07.2019)

1st FLOOR SLAB & BEAM REINFORCEMENT WORKS (15.07.2019)

1st FLOOR COLUMN CONCRETE WORKS (01.07.2019)

TIE BEAM CONCRETE WORKS (30.05.2019)

PILE CAP CONCRETE WORKS (01.05.2019)

PILE CAP REINFORCEMENT WORK (01.04.2019)

PILE HACKING WORKS (15.03.2019)

PILING WORK FINAL STAGE (100% COMPLETED) (01.03.2019)

38th PILING WORK 86% COMPLETED (15.02.2019)

34TH PILING WORK ON PROGRESS (78% COMPLETED) (01.02.2019)

26TH PILING WORK ON PROGRESS (60% COMPLETED) (15.01.2019)

PILE TESTING WORK & 22ND PILING WORK (50% COMPLETED) (01.01.2019)

6TH PILING WORK ON PROGRESS (15.11.2018)

PILING WORK INITIAL STAGE (01.11.2018)

FOUNDATION STONE LAYING CEREMONY (25.10.2018)

BHOOMI POOJA (24.10.2018)

DEMOLISHING WORK FINISHING STAGE (01.10.2018)

DEMOLISHING WORK (20.09.2018)

PUNNIYASHTHANA POOJA (12.09.2018)