OPENING CEREMONY (07.04.2019)
COMPLETED APARTMENTS (01.04.2019)
COMPLETED APARTMENTS (15.03.2019)
MULTIFARIOUS FINISHING WORKS (01.03.2019)
COMMON AREA & OTHER FINISHING WORKS (15.02.2019)
LAYING THE MEMBRANE SHEET TO ROOF & OTHER FINISHING WORKS (01.02.2019)
FIXING OF BATHROOM ACCESSORIES & PANTRY CUPBOARD WORKS (15.01.2019)
FIXING OF PANTRY CUPBOARD & INSTALLATION OF TIMBER FLOORING (01.01.2019)
BATHROOM TILING WORK & ALUMINIUM WINDOW FIXING WORKS (15.11.2018)
BATHROOM TILING WORK & OTHER AREA’S FLOOR BED LEVELING WORKS (01.10.2018)
TILING WORKS FOR BATHROOM FLOORS (15.09.2018)
ROOF TOP RETAINING WALL CONCRETE WORK (01.09.2018)
SWIMMING POOL CONCRETE WORK & ELEVATOR MACHINE ROOM CONCRETE WORK (15.08.2018)
FIXING OF DOOR FRAMES & WALL PAINTING WORKS (01.08.2018)
PLUMBING WORK & INTERNAL, EXTERNAL PAINTING INITIAL WORKS (15.07.2018)
PLUMBING, WIRING & SKIM COAT PAINTING WORKS (01.07.2018)
INSTALLATION OF WALL MOUNTED WATER CLOSET AND ELECTRICAL POWER SOCKETS (15.06.2018)
REINFORCEMENT WORKS FOR SWIMMING POOL & 6TH FLOOR PLASTERING WORK (01.05.2018)
COMPLETED THE STRUCTURAL WORKS & 5th FLOOR UNIT PARTITION WORKS (01.03.2018)
SHUTTERING WORKS FOR ROOFTOP SLAB & UNIT PARTITION WORKS (15.02.2018)
ROOFTOP COLUMNS WORKS & UNIT PARTITION WORKS (01.02.2018)
REINFORCEMENT WORKS FOR 8TH FLOOR COLUMN (16.01.2018)
COLUMN SHUTTERING WORKS FOR 7TH FLOOR SLAB (28.12.2017)
REINFORCEMENT WORKS FOR 5TH FLOOR SLAB (16.11.2017)
REINFORCEMENT WORKS FOR 5TH FLOOR COLUMN (31.10.2017)
SHUTTERING WORKS FOR 4TH FLOOR SLAB (15.10.2017)
SHUTTERING WORKS FOR 4TH FLOOR COLUMN (02.10.2017)
SHUTTERING WORKS FOR 3RD FLOOR SLAB (14.09.2017)
REINFORCEMENT WORKS FOR 3RD FLOOR COLUMN (01.09.2017)
SHUTTERING WORKS FOR 2nd FLOOR COLUMN (15.08.2017)
REINFORCEMENT WORKS FOR 1ST FLOOR SLAB 2nd STAGE (30.07.2017)
REINFORCEMENT WORKS FOR 1ST FLOOR SLAB (15.07.2017)
FORM WORKS FOR 1ST FLOOR SLAB (01.07.2017)
CONCRETE WORKS FOR GROUND FLOOR SLAB (16.06.2017)
SHUTTERING WORKS FOR GROUND FLOOR SLAB (01.06.2017)
FORM WORKS FOR BASEMENT RETAINING WALL (15.05.2017)
PROVISION FOR GROUND FLOOR FORM WORK (30.04.2017)
CONCRETE WORKS FOR BASEMENT RAMP & GROUND FLOOR COLUMN (15.04.2017)
REINFORCEMENT WORKS FOR BASEMENT RAMP & GROUND FLOOR COLUMN (01.04.2017)
BASEMENT CONCRETE WORKS (15.03.2017)
BASEMENT BEAM SHUTTERING WORKS (01.03.2017)
BASEMENT BEAM REINFORCEMENT WORKS 2nd STAGE (15.02.2017)
BASEMENT BEAM REINFORCEMENT WORKS & BASEMENT SUMP PROVISION WORKS (31.01.2017)
BASEMENT SCREED CONCRETE WORKS & BASEMENT BEAM REINFORCEMENT WORKS – 2nd STAGE (16.01.2017)
BASEMENT BEAM REINFORCEMENT WORKS (01.01.2017)
BASEMENT SCREED CONCRETE WORKS (16.12.2016)
SHORING & EXCAVATION WORKS – FINAL STAGE (30.11.2016)
SHORING & EXCAVATION WORKS (17.11.2016)
FOUNDATION STONE LAYING CEREMONY (03.11.2016)
BHOOMI POOJA (02.11.2016)